The purpose of these guidelines is mainly to define and cover the additional risks associated with bunkering LNG and to propose a methodology to deal with those additional risks in order to provide a similar level of safety as is achieved for traditional oil fuel bunkering operations. This document is designed to complement the requirements from the existing applicable guidelines and regulations, such as port and terminal checklists, operator’s procedures, industry guidelines and local regulations. This guide provides guidance to clarify the gaps that have been identified in the existing guidance and regulations. In particular, the following items are covered:
• The responsibility of different parties involved in the LNG transfer,
• The LNG bunkering process,
• SIMOPS
• Safety distances,
• QRA and HAZID.
These guidelines provide recommendations for the responsibilities, procedures and equipment required for LNG bunkering operations and sets harmonised minimum baseline recommendations for bunkering risk assessment, equipment and operations.