Navigation
1400 E. Clement Street
Baltimore,
Maryland,
United States
410-685-5068
This tape is combined with others to identify pipe content as per ISO14726:2008. Pipelines should be marked at least once in each space; at each penetration point in bulkheads and decks, close to each valve and within a distance of 3-5m along the length of the pipeline. Local conditions may require more marking due to pipe bends or the close proximity of pipes for different services.